• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Nasseff Mechanical Contractors

Nasseff Mechanical Contractors

HVAC, Plumbing, Fire Protection

  • Home
  • About Nasseff
    • Our Story
    • Partners
  • Services
    • Heating, Ventilation, Air Conditioning (HVAC)
    • Plumbing
    • Fire Protection
    • Specialty Metals
    • Service & Preventative Maintenance
    • Piping
    • Design Assist
    • Design Build
  • Projects
  • Contact

United/Children’s West End Tower

September 4, 2020 By

The campus remodel consisted of complete demolition and remodel of numerous large areas within the fully occupied campus. These areas were then broken out into various phases within each area to accommodate the operation of the campus. Areas remodeled consisted of the inpatient wing, imaging, pre op, post op, cardio, sleep study, physical therapy, lab, and the emergency department. Construction consisted of new and remodeled med gas services, roof top units, duct work, heating water piping, plumbing, BAS, and control upgrades. This project required extremely close coordination with the entire project team and most importantly the facility to coordinate temporary measures during shutdowns, changeovers, installation of new services and various upgrades to the campus.

Services Provided

Plumbing
Piping
Sheet Metal

Filed Under: Healthcare

  • « Go to Previous Page
  • Go to page 1
  • Go to page 2
  • Go to page 3

Primary Sidebar

Contact Nasseff Mechanical Contracting with any questions you may have.

    Please prove you are human by selecting the Cup.

    Footer

    Nasseff Mechanical Contractors

    "redefining mechanical service"

    Bill Pay

    Warranty Policy
    Privacy Policy

    Phone: (651) 777-0001

    122 S. Wabasha Street
    Suite 101
    St. Paul, MN 55107

      

    Copyright © 2026 Nasseff Mechanical Contractors, St. Paul, MN